Hyundai Sonata: Power Window Relay. Repair procedures
Inspection
| 1. |
Disconnect the negative (-) battery terminal.
|
| 2. |
Remove the junction box.
|
| 3. |
Check for continuity between the terminals.
|
| 4. |
There should be continuity between the No.1 in the I/P-C and No.26(or
39) terminal in the I/P-A when power and ground are connected to the
No.1 terminal in the I/P-C and ground.
|
| 5. |
There should be no continuity between the No.1 terminal in the
I/P-C and No.26(or 39) terminal in the I/P-A when power is disconnected.
[Front]
[Rear]
|
Power Window Switch. Repair procedures
Inspection
Power Window Main Switch Inspection
1.
Disconnect the negative (-) battery terminal.
2.
Remove the front door trim panel.
...
See also:
PDM(Power Distribution Module). Schematic Diagrams
System Circuit Diagram
...
Repair procedures
Compression Pressure Inspection
If the there is lack of power, excessive oil consumption
or poor fuel economy, measure the com ...
Repair procedures
Component Replacement After Deployment
Before doing any SRS repairs, use the GDS Pro to check for DTCs.
Refer to the Diagnosti ...




